EVIDENCE · PROVENANCE · LIMITS

Not every number has the same evidence status.

SettlePoint separates operational software, development estimates, sealed-confirmed risk results and client-specific executable evidence. This page says which is which.

THE EVIDENCE CLASSES

Four tools. Four precise claim ceilings.

Quote Margin

Operational for supported cells. Development estimate of adverse midpoint movement; not an executable quote or guaranteed client protection level.

Margin Watch

Live measured headroom plus a development estimate of remaining midpoint path risk; not proof that a warning prevented a loss.

Managed Spot

Operational execution workflow with a sealed-confirmed risk result: Risk First dispersion was 20%–26% of unmanaged due-date settlement.

Bank Check

Deterministic comparison. It becomes client-specific hard evidence when like-for-like executable quotes or actual fills are supplied.

TRACK RECORD, STAGE BY STAGE

How often each tool held.

StageToolWhat we measureTargetResultHardest test
CommitQuote MarginAllowance held, on periods it had never seen90%91–100%COVID crash: median 81%
Commit + ManageQuote Margin with Margin WatchQuotes where the allowance ran out, 60-day USD imports since 2019–0 in 100Flat 5% buffer: 17.8 in 100; Quote Margin alone: 6.7
DecideLock now or stay at spotWorst-case figure exceeded5%5.8%Passed a one-time 2008–09 check
ManageMargin WatchInvoices whose margin ran out, acting at half used–0.6 in 100Held to payment: 11.6 in 100 (30,814 invoices)
ManageManaged Spot, Risk FirstThe bad 1 in 20, 60-day USD imports, against converting at arming–1.1% of valueWaiting to the due date: 7.7%
Deal · SettleBank Check, settlementHow precisely one deal is graded against the market–±0.1% with the hour±0.6% with only the date

Each measure answers a different question, so they are never added or averaged. A figure is a record of what happened on the rand's own prices, not a promise for the next invoice.

LOCK OR WAIT, BY CONTRACT LENGTH

Lock or wait is close to a coin toss. The bad 1 in 20 is not.

With one bank margin on both roads, waiting beat locking a little over half the time and the average difference was close to nothing. What locking removes is the tail.

Open forWaiting beat lockingBad 1 in 20 of waiting, per R1mQuote Margin allowanceAllowance ran out, per 100: alone / with Margin WatchFlat 5% buffer ran out, per 100
30 days57%R68,3005.95%8 / 011.5
60 days58%R76,4007.58%6.7 / 017.8
90 days57%R99,4009.20%6.8 / 020

USD/ZAR imports, one start every trading day since 2019, the lock priced at the fair forward so the bank's margin cancels. Quote Margin sizes the allowance to the contract length, which is why it grows from 30 to 90 days.

Managed Spot: the open amount, under a rule.

60-day USD/ZAR invoicesBad 1 in 20: waiting to the due dateBad 1 in 20: Risk FirstLost more than 2%, per 100: waiting / Risk FirstRisk First on average
Importers−7.7%−1.1%31 / 1−0.02%
Exporters−7.5%−1.3%38 / 1+0.04%

Each result in % of value against converting on the day the plan was armed, interest on early conversion charged; 382 weekly invoices per side, 2019–2026. A record, not a promise: protection also gives up some of the upside. Every plan is a preset your business adopts and confirms.

DEVELOPMENT ESTIMATES

Useful for control. Labelled before they are used.

Quote Margin: 135,630 causal development predictions produced 26 supported pair, side and horizon curves, 6 of them CNY/ZAR (indicative); 14 cells are withheld. Mean historical midpoint coverage was 80.29% for Lean, 89.30% for Balanced and 94.58% for Strong. Beyond the lengths those curves were tested on, SettlePoint’s historical table prices every pair from 1 day to 6 months, and each result says which it used.

Margin Watch: 149,874 causal development predictions produced 21 supported curves, 2 of them CNY/ZAR (indicative); 19 cells are withheld. Mean historical midpoint path coverage was 86.08% for Lean, 94.64% for Balanced and 97.63% for Strong.

Replayed on production’s own prices (15 October 2026): before shipping, the curves, the historical table and Margin Watch were run unchanged on the price history SettlePoint quotes from, and graded only on periods they had never seen. On those periods the Balanced reserve held in 91% to 100% of windows against its 90% target. The COVID crash (February to August 2020) is reported separately and never graded: there the tested model’s Balanced reserve held in a median 81% of windows, and the weakest historical-table cell in 56%. The same check now runs every day on new prices.

Those means summarise supported cells. They are not confidence statements for one invoice. Every live result must carry its pair, importer/exporter side, horizon, target and supported/withheld status.

SEALED MANAGED SPOT RECORD

The strongest approved statistic is risk, not average return.

Managed Spot mechanics were frozen and graded on 51,517 invoice cases from periods not used to design them. Across four sealed party-era cells, Risk First compressed outcome dispersion to 20%–26% of unmanaged due-date settlement.

Controlled Participation and Opportunity First are separate choices with their own records; their results varied by period, pair and client side. No plan is promised to beat settling now.

CHECK OUR WORKING

Every figure can be rerun.

One study, pinned. The track record, the tables above and every figure on the home page come from one study, run on committed hourly and daily USD/ZAR, EUR/ZAR and GBP/ZAR prices from 2019 to 9 September 2026. Its inputs are fingerprinted, and one command reruns it and checks that each figure still comes out the same.

Fair benchmarks. Each tool is compared with a common habit: a flat buffer in the price, locking everything at booking, waiting to the due date, or converting on the day. Locking and waiting are charged the same bank margin, so the bank's price cancels and only the rand's move is compared.

No look-ahead. At every decision the study uses only prices from before that moment, and nothing was fitted to the periods it reports.

The 30,814 invoices behind Margin Watch's invoice figures are modelled on how procurement departments of five business sizes receive invoices and contracts, created from late 2021 to the end of 2023. Margin Watch fired on 46 in 100 sixty-day USD imports, at a median of day 20.

Not yet audited. These are SettlePoint's own calculations. An independent recalculation by an auditor is planned; until then the method, the inputs and the scripts are available to any client or auditor on request at derik@settlepoint.tech.

HONEST LIMITS

What these numbers cannot do.

Historical midpoint bars are not executable bid/ask RFQs. They do not contain actual quote expiry, bank markup, slippage, payment fees, value-date adjustments or the client’s realised all-in settlement price. A modelled warning is not a saving by itself. Hard value is counted from comparable executable bank quotes and realised spot results against the inception settle-now rate, net of disclosed costs.

SettlePoint does not combine the headline results of Quote Margin, Margin Watch and Managed Spot into one ROI number. That would double-count risk and value. A client case starts with invoice, RFQ and fill evidence and is then tested prospectively under frozen rules.

Judge us on the record.